Planning a kitchen in an extension.

An extension is the best chance to get the kitchen layout exactly right, because pipes, cables and ducting can go wherever the plan needs them. The trick is planning the kitchen early and ordering the cabinets at the right time.

Black kitchen island with Sand Gladstone Oak end panels and bar stools

1 · Plan early

Plan the kitchen before the builder starts.

Decide the kitchen layout while the extension is still on paper. Your builder, plumber and electrician need it to put services in the right place. Send us your architect's drawings and we can plan and price the cabinets from them, then confirm sizes once the room is built.

  • Islands need water, waste and power brought up through the floor before the screed goes down.
  • Sinks and dishwashers need waste runs with enough fall, so check where the waste can leave the building.
  • Extractors need a ducting route to an outside wall or through the roof.
  • Sockets and lighting should be placed for the worktop run, under-cabinet lights and appliances.
  • Rooflights and windows decide where tall units and wall cabinets can go.

2 · Measure the finished room

Measure after plastering, not from the plans.

Rooms are never built exactly to the drawing. Once the walls are plastered and the floor is screeded, measure the actual room using our measuring guide and send us the final sizes. We update the drawings and you approve them before we make anything.

Underfloor heating? Tell your fitter. Cabinet legs and plinths sit on the finished floor, and fixings must avoid the pipes.

3 · Order at the right time

Time the order with the build.

Kitchens take us 2 to 3 weeks to make once the drawings are approved and the deposit has cleared. Most people order when the extension is watertight and plastered, so the cabinets arrive when the room is dry and the floor is down.

Plaster and screed need time to dry before cabinets go in. Ask your builder when the room will be ready for the fitter, and plan the delivery for then.

4 · Open-plan living

Match the rest of the room.

Extensions are often kitchen, dining and living space in one. Because we make every cabinet to measure, the same board and doors can carry on into a pantry, utility, boot room, home office or media wall, so the whole space matches.

Checklist

Extension kitchen checklist.

  • Kitchen layout agreed before the foundations and floor go in
  • Island services brought up through the floor before screeding
  • Waste routes with enough fall for the sink and dishwasher
  • Extractor ducting route planned
  • Sockets, spurs and lighting positions marked on the plan
  • Room measured after plastering and screeding
  • Drawings checked and approved before ordering
  • Delivery booked for when the room is dry and ready

Buying from DTJ

More on buying from DTJ.

Kitchen guide

How a kitchen remodel works

The order things happen in, who does what, and how long each stage takes.

Read the guide →

Before you order

Measuring guide

How to measure a kitchen, bedroom or alcove so the cabinets fit first time.

Read the guide →

Buying from DTJ

How it works

Measure, quote, deposit, make, deliver, and your joiner fits. Six steps from your sizes to a finished room.

See how it works →

Supply only

Supply-only cabinets

We make it, you or your joiner fits it. What supply-only means and what comes in an order.

Supply-only explained →

See it first

Samples

Board decor and door samples, £10 each and taken off your kitchen or bedroom order. Collect them from the workshop, or we post them in 3 to 5 working days.

Order samples →

Fitting

Find a fitter

We can put you in touch with local joiners who fit our cabinets.

Ask for a fitter →

Get a quote

Building an extension?

Send us your architect’s drawings at info@dtjinteriors.co.uk, call 0115 784 8231 or WhatsApp 07956 032306, and we will plan and price the kitchen.